Turnkey Field Installation, Testing & Plant Maintenance

Turnkey Electrical Installation, Testing & Plant Maintenance Services in Saudi Arabia

Bridging tier-1 factory procurement and physical field execution: deploying licensed engineering teams for switchgear commissioning, power cable termination, insulation testing, and 24/7 emergency plant maintenance adhering to ISO 9001/45001 standards.

View Testing & Inspection Protocols
CAPABILITIES SCOPE

Scope of Licensed Field Engineering Execution

Certified electromechanical site works executed strictly under ISO 9001:2015 Quality and ISO 45001:2018 Occupational Health & Safety management frameworks.

01

Power Cable Laying, Pulling & MV/LV Termination

Trench and elevated tray cable pulling for low and medium voltage feeders. Execution of medium voltage stress-relief termination kits and splicing joints utilizing certified Raychem and 3M heat-shrink/cold-shrink systems with calibrated pressure testing.

Cable Pulling • Raychem / 3M Terminations
02

Switchgear, Distribution Board & Transformer Commissioning

Positioning, alignment, and internal torque verification of Main Distribution Boards (MDBs), Motor Control Centers (MCCs), and oil-immersed/cast resin transformers. Busbar torque calibration, phase-sequence checking, and automatic breaker operation testing.

Transformer Commissioning • Busbar Torque
03

Predictive & Preventive Maintenance Programs (PPM)

Scheduled preventative maintenance programs including infrared thermographic inspection for hotspot isolation, insulation resistance Megger testing, ground resistance verification, and secondary injection testing on electronic circuit breakers.

Thermography • Megger Testing • Preventive PPM
04

24/7 Emergency Outage & Breakdown Mobilization

Round-the-clock emergency field technicians equipped for rapid fault isolation, feeder restoration, transformer breakdown repairs, and control panel troubleshooting to slash unplanned facility downtime across the Kingdom.

24/7 Emergency Mobilization • Rapid Uptime
ENGINEERING BENCHMARKS

Diagnostic Instrumentation & Testing Protocols

Accredited testing procedures ensuring complete system safety and regulatory compliance prior to permanent facility energization.

01

Electrical Safety & Resistance Diagnostics

Insulation Resistance (Megger)Testing up to 5kV and 10kV with calibrated Megger and Fluke diagnostic instruments
Earth Ground Resistance TestingThree-point fall-of-potential testing compliant with IEEE 81 grounding standards
Contact Resistance MeasurementMicro-ohm contact resistance testing on switchgear contacts and busbar splices
High Potential (Hi-Pot) WithstandDC and VLF AC withstand testing on medium voltage cable runs per IEEE 400
02

Thermal Diagnostics & Power Quality

Infrared Thermal ImagingFluke high-resolution thermographic cameras detecting thermal anomalies on busbars and terminals
Power Quality & Harmonics AnalysisLogging voltage sags, power factor (PF), total harmonic distortion (THD), and phase balance
Protection Relay Injection TestingPrimary and secondary current injection verifying trip curves and instantaneous protection
Transformer Dielectric Oil TestingDielectric breakdown voltage testing and moisture analysis for liquid-insulated units
03

Regulatory Licenses & HSE Standards

Quality Management CertificationISO 9001:2015 Certificate #305026060860Q accredited by EGAC and IAF
Health & Safety ManagementISO 45001:2018 Certificate #305026060861HS guaranteeing zero-harm field execution
Site Safety Work PermitsStrict adherence to Lockout/Tagout (LOTO), Job Safety Analysis (JSA), and Permit-to-Work
Commercial Registration ScopeOfficially licensed for Supply, Installation, Maintenance & Repair (CR: 4039100359)
PROJECT APPLICATIONS

Target Operating Facilities & Client Sectors

Heavy Manufacturing & Industrial Facilities

Annual plant maintenance contracts (SLA), turnaround execution, motor overhauls, and distribution board retrofits in MODON cities.

Refineries & Petrochemical Processing Facilities

Hazardous area electrical installations executed under certified permits and stringent safety protocols in Yanbu and Rabigh.

Power Transmission & Secondary Distribution Substations

Cable pulling, transformer termination, switchgear positioning, and pre-commissioning testing for utility grid networks.

Critical Infrastructure & Data Centers

Preventative inspection of Automatic Transfer Switches (ATS), Uninterruptible Power Supplies (UPS), and diesel backup synchronization.

TECHNICAL FAQ

Frequently Asked Procurement Questions

For facilities located within the Western Province (Jeddah MODON 1, 2, 3, Bahrah industrial corridor, Makkah, and Rabigh), our certified emergency technicians mobilize with diagnostic instrumentation and spare components within 2 to 4 hours of your notification.

Yes. Upon completion of any installation or maintenance testing protocol, our engineers issue a comprehensive commissioning dossier detailing calibrated instrument readings, insulation resistance tables, thermographic scan imagery, and preventative engineering recommendations suitable for submission to engineering consultants or property insurers.

Yes. All Tasneem field personnel undergo rigorous HSE training under our certified ISO 45001:2018 management system. Technicians are fully equipped with certified flame-resistant clothing (FRC), multi-gas detectors, calibrated PPE, and operate strictly under formal Lockout/Tagout (LOTO) and Permit-to-Work procedures.

Yes. We frequently execute planned maintenance during scheduled plant turnarounds (Shutdowns). Our team pre-allocates replacement switchgear components, cables, and testing crews operating on round-the-clock shift rotations to complete critical maintenance within your target window.

Ready to Submit Your Bill of Quantities (BOQ)?

Our engineering sales team matches exact technical specifications with factory inventories to issue official commercial proposals within 24 hours.

WhatsApp: 056 363 0366